Tutorials/Industrial Risk/PHA — Hazard study (Seveso)
Industrial Risk

PHA — Hazard study (Seveso)

ICPE/Seveso regulatory component

Industrial Risks menu → 3. Hazard-study PHA

Regulatory PHA for Seveso facilities: initiating event, top event, hazardous phenomenon, consequences, and passive and active risk-control measures.

Screenshot: ri-apr-edd-01.png 📷 Screenshot to be added img/ri-apr-edd-01.png

What you will do

  1. Describe the initiating event and associated top event.
  2. Record the hazardous phenomenon and its consequences.
  3. List passive and active risk-control measures and their effect on the final rating.

Pitfall to avoid. This rating uses the fixed PIGC scales from the hazard-study framework, which differ from generic severity/likelihood scales. Do not modify them; they are prescribed.

FR