Skip to content

Workshop 4 — Operational scenarios ​

Workshop 4 translates strategic scenarios into technical attack chains on the support assets, and computes the risk level of each scenario.

Sub-steps of the workshop ​

StepPageContent
4.1Operational scenariosBuilding the attack chains (technical actions) and rating
4.2Likelihood assessmentSummary of the likelihood of all operational scenarios
4.3Scenario generatorAssistance generating scenarios (optional)

Pages 4.1 and 4.2 are detailed respectively in Operational scenarios and Likelihood assessment.

  1. For each retained strategic scenario (Workshop 3), build one or more operational scenarios (4.1): a sequence of the attacker's technical actions on the support assets, with a likelihood rating.
  2. Review the likelihood summary (4.2) to view and adjust the rating across all scenarios.
  3. Use the scenario generator (4.3) if needed to speed up drafting.

Consistency with Workshop 3

An operational scenario must remain linked to a strategic path from Workshop 3 — this is what guarantees full traceability from risk source → path → technical action → risk.

Going further ​

See Operational scenarios and Likelihood assessment.

Polyodos — Documentation utilisateur