5.3 — Action plan (PACD)
Page /ebios/pacd — Risk treatment plan (PACD): selection and detailed scheduling of security measures for each risk to be treated, identified in Workshop 4 and assigned a treatment strategy (page 5.2).
Header
Statistics shown: number of risks to treat, total number of measures.
| Button | Function |
|---|---|
| ⬇ Export XLS | Exports the treatment plan to Excel (.xlsx) |
Tabs
| Tab | Content |
|---|---|
| By risk | Detail of measures, risk by risk |
| Measures summary | Consolidated view of all measures, filterable by category |
| Owners | List of owners assigned to measures |
Global controls
| Toggle | Effect |
|---|---|
| 🌐 PP Eco | Shows/hides measures coming from ecosystem stakeholders (Workshop 3.3) |
| 🔒 SS A3 | Imports security measures already defined in Workshop 3.3 into the risk table |
| Constraints | Shows/hides the Cost / Constraints / Effort column |
| Effectiveness | Shows/hides the Effectiveness column |
| Comments | Shows/hides the additional comments field on each measure |
| ⊞ Expand all / ⊟ Collapse all | Expands or collapses all risks at once (By risk tab) |
By risk tab — measure table columns
| Column | Description |
|---|---|
| Category | Type of measure (TYPES_MESURE list) |
| Name / Description | Name, description and comments of the measure. Inherited measures show an origin badge: 🔗 PP Eco (Workshop 3.3) or 🔒 SS Measure (Workshop 3.3) |
| Element | Links the measure to a project element type (type-selection button then dropdown) |
| Cost / Constraints / Effort | (togglable) |
| Status | State of the measure |
| Progress | Progress |
| Owner | Person in charge of implementation |
| Deadline | Target date |
| Priority | Implementation priority |
| Eff. | (togglable) Estimated effectiveness of the measure |
Measures summary tab
Groups all measures from all risks, with a filter by category (clickable chips, including "No category") to focus on one type of measure at a time (e.g. technical measures only).
Owners tab
List of responsible people or entities, with a count of the measures assigned to them.
Measures inherited from the ecosystem
Measures marked 🔗 or 🔒 come from Workshop 3.3 (ecosystem measures) — they are not duplicated manually, turn on the PP Eco / SS A3 toggles to have them appear automatically in the plan.
Next step
Once the measures are scheduled, check their effect on the risk in Residual risks (page 5.4).
See also Workshop 5 — Overview.